For accounting practices
Offer VSME working papers to your EU-sub clients - without becoming an ESG specialist.
Try free with 1 client. Then pick a pack - from £595 for 2 packs.
Client-ready working papers
Each figure shows the bill, the kWh, the government emission rate and the sum — easy to review and file.
One place for many clients
Run several SME clients side by side in one practice view.
Tender and NHS requests
Prepare the carbon figures clients are asked for in PPN 006 and NHS supplier requests.
Primary bill evidence vs. spend-based estimates
| Spend-based ledger estimates | vsmecap | |
|---|---|---|
| Data source | £ spend in the accounting ledger | kWh and litres from the supplier bill |
| Price rises | Footprint rises when tariffs rise | Only changes when usage changes |
| Tender / SECR use | Scope 1 & 2 should use activity data | Activity data with meter references |
| Evidence trail | Ledger line | Bill, meter, factor and file fingerprint |
| Ledger access | Read access to the client's books | Bills read in the browser, not stored |
Junior-proof by design: spike, unit and benchmark checks flag likely keying errors, manual overrides are marked, and every report carries a prepared-by / reviewed-by sign-off. Working with charities? See the charities guide →
Bills-first, not bills-only
For statutory SECR and VSME B3, the most defensible numbers come from primary documents, not spend estimates or questionnaires.
Bills give you the bedrock: metered kWh → DESNZ factor → traceable tCO2e, with SHA-256 hash. That covers Scope 2 electricity, Scope 1 gas heating, and Scope 3 Cat 3 T&D/WTT — the bulk of an office-based SME's operational footprint.
Bills don't cover everything: transport fuel, refrigerants, oil/LPG, intensity ratio, or efficiency narrative still need other evidence. vsmecap starts with the bill, then flags what's missing — it doesn't pretend the bill is the whole audit.
Think VAT / payroll: primary bill in → deterministic math → defensible working paper out. For the rest, we tell you what's still needed.
Step 1 bills → Step 2 five gap documents → one client report
- Step 1 · Utility bills: electricity and gas kWh × DESNZ factors (Scope 2, Scope 1 gas, Scope 3 Cat 3)
- Step 2 · Fuel card, oil/LPG delivery, F-gas log, REGO certificate, site list
- Everything feeds the same 3-page report and working paper, with Bill-verified / Other-evidence / Still missing status
Each gap is one document plus one or two fields — no long surveys. Bills-first, not bills-only.
Have EU-sub clients?
Have clients with an EU parent or who sell to EU groups? They need VSME Basic to keep the contract. Send them to /eu-subs - VSME Basic + SECR + PPN 006 in one pack from same bills. VSME isn't UK law. It's how EU buyers ask UK suppliers for data.
See EU-subs page →Practice Partner - Flexible packs
1 pack = 1 client, 1 site, 12 bills, VSME B3 + SECR + PPN 006 pack.
2 packs · Try it
5 packs · Starter
10 packs · Growing
25 packs · Partner
Best valuePacks last 12 months. Upgrade anytime - we credit what you already paid. Example: Bought 2 for £595, upgrade to 10 for £1,655 extra.
vsmecap prepares calculations from bills. It is not an audit, assurance or certification service.
